Ding! Your winter concrete equipment maintenance guide has been delivered
Mixer Truck Chapter
Mixing Plant Chapter
Precautions in Severe Cold Winter Weather
1.When the temperature is below 0℃, the aggregate conveyor belt can be loosened by increasing the counterweight or adjusting the degree of the tail
adjustment pull rod, etc., so that the belt does not slip.
2.After the construction of the mixing plant is completed on the same day, the water intake pump, drainage pump and water metering hopper equipment
should be drained to prevent the pipelines, pump bodies and valves from cracking due to freezing.
3. When the ambient temperature reaches 0℃, the admixture will crystallize and change from a liquid to a semi-fluid state. Preheating should be carried
out before each startup to prevent the mechanical seal of the water pump from burning out due to idling.
4. Drain water from the air compressor, air storage tank, three-piece unit and other places to prevent freezing.
5.Before starting up, the air conditioner in the control room should be turned on for about 30 minutes. Only after the indoor temperature rises can the
industrial control computer and electrical equipment be started.
6.After each construction of the mixing plant is completed, the remaining materials in the sand and gravel silo should be emptied to prevent freezing and
affect the normal use next time.
Work Preparations in Severe Cold Winter Weather
1.The gear oil of each reducer should be replaced.
2. Check the scraper for replacing the belt.
3.When the temperature is below 5℃, it is recommended to use Sany's special No. 1 extreme pressure lithium-based grease for the grease pump of the
stirring host to prevent the oil supply pipeline from being blocked.
Related articles
- Unmanned driving vs. Human drivers: What are the outstanding features of Sany's 5G unmanned electric
- Outstanding professionalism and reliable quality! Why is the Xingma Light Cavalry so favored by user
- Yuchai excavators have performed outstandingly in overseas markets with a year-on-year growth of 36%
- Lingong L975F helps overseas customers warm up for the winter, providing more energy for Kazakhstan
- Liugong Service 10,000 Mile Journey - Nanny-style Service to safeguard your journey
- Causes and improvements for the fracture of the upper crossbeam of the loading boom
- What suits you best is the best! Shantui LE59-X2i remote-controlled pure electric loader, leading th
- Continuously leading the overseas market, see Tongli Heavy Industry's "Glorious Journey Oversea
- "Start anew, win the future with '9'!" XCMG has launched 49 new types of loading machinery
- 20 XCMG rotary drilling RIGS "team-building" Yunnan "Green Steel City"