What are the requirements for the assembly and adjustment of forklift steering axles?
The requirements for the assembly and adjustment of the steering axle are:
After the steering axle is assembled, there must be correct connections and fit clearances between each part.
The clearance between the steering knuckle and the steering knuckle pin shaft should not exceed 0.1mm.
2) The end clearance between the steering knuckle and the steering axle is generally 0.05 to 0.1mm. If the end clearance is too large, an adjusting gasket can be installed for adjustment.
The maximum clearance of the needle roller bearings between the steering knuckle shaft and the steering axle should not exceed 0.1mm.
After the hub bearing of the steering axle is lubricated with grease and installed, tighten the adjustment and fixing nut of the hub bearing. When it is difficult to turn the wheel, the nut should be retracted by 1/5 turn and then the lock washer should be installed. When turning the wheels, it should be smooth and flexible. When turning the wheels, there should be no feeling of axial clearance.
5) Adjust the parallelism of the wheel hub, with an error not exceeding 1mm. This can be done by adjusting the steering rod screw. After adjustment, tighten the stop nut.
6) Adjust the corner. Lift the steering axle, turn the hub to the left end position, adjust the piston rod of the steering cylinder, then place the spring washer and tighten the nut.
Related articles
- Several parts modification methods for the Caterpillar CAT950E loader
- How to troubleshoot the faults of the brake caliper of a loader
- Analyze the reasons why the excavator boom of CAT320B cannot descend
- How to install and adjust the speed control motor of the CAT325L excavator
- The working principle and troubleshooting methods of the hydraulic overload protection system for me
- Sany Heavy Industry: Inter-city transportation is no longer a dream! The Jiangshan SE-565C with a ra
- Sany Heavy Industry: Noise-free, zero emissions, and long range! The industry's first 50-ton pure el
- There's a way to save energy and increase efficiency! The Liugong 886H hydrostatic loader has receiv
- Precautions and suggestions for the use and maintenance of loaders in winter
- Analyze the common faults of the gas control valve of the W4-60C excavator